I will see how the weather turnes out over the next few weeks. Its been to cold to spray in our workshop. I am putting together a list but its a long list that includes.
1 2 post lift
2 New tig welder
3 a set of tyres as mine are shot!!
So the turbo is not at the top. But its on the list. I am hopping to build the system and keep using the car. Due to the way its being built i can get almost all the pipe work in Turbo mounted and all other work done. Then the day before we go to the dyno and set it up i can make the connections. Then hopefully drive home in a very quick car......
1 2 post lift
2 New tig welder
3 a set of tyres as mine are shot!!
So the turbo is not at the top. But its on the list. I am hopping to build the system and keep using the car. Due to the way its being built i can get almost all the pipe work in Turbo mounted and all other work done. Then the day before we go to the dyno and set it up i can make the connections. Then hopefully drive home in a very quick car......