mad4slalom
Senior member
the highways have surface dressed the road outside my place today wirh tar and two layers of chippings the large fistr layer was rolled in then a finer chip was layered on top, they sweep and vacuum up the excess after 24 hours. so the coupe is stranded foe a few days at least, ...too risky :thumbsdown: they have earmarked a lot of roads around us in the next few weeks, :thumbsdown:
