Morning all
So the day has come! I'm collecting the Zed from Daz Wood this morning
Its been an interesting year with the Zed, but today should be the ultimate experience for me as since ownership it will be the first time the car is set up as it should be with working parts! So the list of work done at Daz Woods:
1) Poly arb bushes.
2) Standard shock replacements at front (until next year).
3) New drop links.
4) Control arm bushes.
5) Top mounts.
6)Fault code reset.
7) New hubs.
8.) New Clutch.
9) New Flywheel.
10) Finally alignment that worked !
Feel super excited :driving: Oh snap, the bill :thumbsdown: :headbang:
So the day has come! I'm collecting the Zed from Daz Wood this morning

1) Poly arb bushes.
2) Standard shock replacements at front (until next year).
3) New drop links.
4) Control arm bushes.
5) Top mounts.
6)Fault code reset.
7) New hubs.
8.) New Clutch.
9) New Flywheel.
10) Finally alignment that worked !
Feel super excited :driving: Oh snap, the bill :thumbsdown: :headbang: