Well after Autoglyming my roof and washing the car.
Then pads and discs all round on a mates CRV, bit of lunch
Disa Valve strip down and rebuild with the i6 kit off ebay, while I was there pull out 1 bit of foam for the sound generater mod. I thought I'd call it a day.
Then tomorrow get out and about and over to Jonny Essex to have ago at illuminating his new door strips.
Quite looking forward to meeting the man behind probably the most read and talked about posts on the forum.
Stuart.
Then pads and discs all round on a mates CRV, bit of lunch
Disa Valve strip down and rebuild with the i6 kit off ebay, while I was there pull out 1 bit of foam for the sound generater mod. I thought I'd call it a day.
Then tomorrow get out and about and over to Jonny Essex to have ago at illuminating his new door strips.
Quite looking forward to meeting the man behind probably the most read and talked about posts on the forum.
Stuart.