Hey guys, been a busy couple week. Girlfriend had her heart set on new kitchen so after multiple joiners and company marching through our house and us going and viewing door and testing cabinets finally completed today ( minus tiling, painting and new floor )
So in last 6 weeks i had to get building warrant ( for removal of non load bearing wall ), rip out half the wall so could get new combi boiler installed. Get joiners out remove the rest of the wall and remove another section of another wall, plaster, more sockets, plumb in my fridge. Safe to say the house has been a warzone and its hard work going to someone else's house for 2 weeks to be cooked for and have takeaway.. drains life out of you
anyways thought i would share pictures of it
let me know what you think
doors are Second Nature Milbourne Alabaster http://www.sncollection.co.uk/kitchens/milbourne-alabaster.html
carcasses are bespoke 18mm rigid colour coded integrated Hettich Softclose hinges -http://www.stevenswood.co.uk/stevenswood-kitchens/sixteen-top-tips.html
worktop's are 40mm solid oak ( full 4m length ) and 2x 60cm sections with matching upstands
belfast sink and swan tap with ceramic handles
integrated dishwasher, washing machine and recyling bins
just waiting on my cooker which is delayed, which is a Stoves Richmond 100cm Range in Jalapeno Red

old kitchen & dining room



small section removed for boiler to be installed and boiler company arrive


installed

kitchen removed

wall widened




old boiler cupboard removed and plasterboarded along with pipe box renewed



plaster skimming




units put into place

sink in place

opposite wall where range cooker going

integrated appliances installed awaiting doors

our bespoke cut down larder units

another larder in place

our little oven looking dwarfed lmfao

worktop first sand, seal and oil, needed done 3x

boiler cupboard and pipes hidden

range cooker space with top box installed with 2x integrated extractors

appliance doors fitted and kitchen complete

belfast sink

testing led downlights


and with extractor lights

got some painting to do this weekend, then get tiler in to tile ( going to metro style tiles ) then medium oak flooring to be fitted..
Thanks!
So in last 6 weeks i had to get building warrant ( for removal of non load bearing wall ), rip out half the wall so could get new combi boiler installed. Get joiners out remove the rest of the wall and remove another section of another wall, plaster, more sockets, plumb in my fridge. Safe to say the house has been a warzone and its hard work going to someone else's house for 2 weeks to be cooked for and have takeaway.. drains life out of you
anyways thought i would share pictures of it
doors are Second Nature Milbourne Alabaster http://www.sncollection.co.uk/kitchens/milbourne-alabaster.html
carcasses are bespoke 18mm rigid colour coded integrated Hettich Softclose hinges -http://www.stevenswood.co.uk/stevenswood-kitchens/sixteen-top-tips.html
worktop's are 40mm solid oak ( full 4m length ) and 2x 60cm sections with matching upstands
belfast sink and swan tap with ceramic handles
integrated dishwasher, washing machine and recyling bins
just waiting on my cooker which is delayed, which is a Stoves Richmond 100cm Range in Jalapeno Red
old kitchen & dining room



small section removed for boiler to be installed and boiler company arrive


installed

kitchen removed

wall widened




old boiler cupboard removed and plasterboarded along with pipe box renewed



plaster skimming




units put into place

sink in place

opposite wall where range cooker going

integrated appliances installed awaiting doors

our bespoke cut down larder units

another larder in place

our little oven looking dwarfed lmfao

worktop first sand, seal and oil, needed done 3x

boiler cupboard and pipes hidden

range cooker space with top box installed with 2x integrated extractors

appliance doors fitted and kitchen complete

belfast sink

testing led downlights


and with extractor lights

got some painting to do this weekend, then get tiler in to tile ( going to metro style tiles ) then medium oak flooring to be fitted..
Thanks!