and so the winter project begins

ZOID

Member
Hi All

So Since I purchased @auldays Z 2.5 se since last October I have now finished all the mechanicals. New brakes, bushes, coolant bottle, noisy pulleys, airbag module issue, intake leak, to name a few. I also did a load of upgrades along the way such as alcantara steering wheel, carpets, rear tailpipes, vented discs, handbrake shoe, custom tune, angel eye headlights, rear spoiler.... a whole host of things, the list is rather a long one. Anyway ....

managed to get 1500 miles this summer whilst doing the fixes and upgrades. but now shes back in the bodyshop this time for new bumpers, paint etc.

Gutted the summers over but bery much looking forward to next year now.

I wont mention the supercharger as most people fell out about it last time saying i was an idiot lol so I'll just post a pic instead of bodywork

z43.jpg
 
Enjoy the project, including the Supercharger plan if you want it. :thumbsup:
 
Mr Tidy said:
Enjoy the project, including the Supercharger plan if you want it. :thumbsup:

Ditto on the above! Being called an idiot often says more about the person issuing the character reference. Besides, with an increasing amount of “sensible” (read: boring) cars on the roads, our Zeds are a welcome reprieve from such staleness. A supercharger only turns that up to 11 8)
 
Well done!
Get that supercharger fitted and sod them!
In fact, stick a load of M badges on as well. :poke:

It's your car. :thumbsup:
 
Clearly I missed the supercharger debacle from last time...but this is the meat of the build!

Will be all too happy to see progress on that! :thumbsup:
 
Others have supercharged their E85s..if you want to go for it.. :driving:

Some professional pissers on bonfires on this forum these days..sadly.. :tumbleweed:
 
ZOID said:
Gutted the summers over

Winter !!! Summers over !!! You really know how to cheer us up . Looking forward to the rest of the build though :thumbsup:
 
Back
Top Bottom